High Level Flood Flow Canal From Chazhoor to Mullasserry
Tranche RIDF VIII
Aim of the Project Prevent flood water intrusion into Kole Lands of about 1400ha paddy and 1500 ha garden land spread over in 6 panchayaths of Thrissur district for successful paddy cultivation.
Outlay Rs.495.39 lakh
Major Components Canal deepening – 5451m, Formation of bund 9039m Flood inlets- 4 nos., Pipe sluices -12 nos.,
Box culverts-10 nos. , Ramps – 5 nos
Status Completed

 

Pokkali Land Development Project Phase I
Tranche RIDF X
Aim of the Project Improving Pokkali fields of Ernaklulam and Alappuzha Districts by stabilizing paddy fiels of 4050 ha and to bring additional 1000 ha fallow land under paddy cultivation along with prawn cultivation also.
Outlay Rs. 2799 lakh
Major Components

Raising of bund -61.892km,
Retaining wall – 91.873km, Sluices-76,
Engine thara-12 nos.  Engine shed-10 nos.

Status Completed

 

Infrastructural Development of Pranthan Puthankari in Puthupally, Kottayam
Tranche RIDF X
Aim of the Project Providing infrastructural facilities for dewatering and drawing the canal water and thus stabilizing present crop of paddy followed by an additional crop of paddy or fish in Pranthan Puthankari Padasekharams of Puthupally Panchayat of Kottayam District.
Outlay Rs.30.95 lakh
Major Components Retaining Wall   - 276m, Side protection wall-600m, Outer bund -665 m, Pitching  - 1239m ,
Vacha Protection - 81.50m, Engine thara - 1 no,
Flood inlet - 1 no
Status Completed

 

Vaikom Kari Land Project Phase I
Tranche RIDF X
Aim of the Project

The Project area spreads over 3 Panchayaths namely Thalayazham, Thalayolaparambu and Kallara of Vaikom Block in Kottayam District for a total benefited area of 1830 ha . Project area is benefited with  two crop cultivation of paddy without crop failure.

Outlay Rs.1397.66 lakh
Major Components Outer Bund-79717 m, Retaining wall-41609m,
Vachal Protection-1138m, Engine Thara-20Nos,
Flood Inlet-28Nos, Foot Bridge cum Regulator-2Nos and Tiller Passage – 5 Nos.
Status Completed

 

Kuttanadu Development Proect (3 Schemes via Mankotta, Iravukari & Valiyakari)
Tranche RIDF XI
Aim of the Project

Infrastructural development works in three padasekharams via Mankotta, Iravukari & Valiyakaricovering 261.5 ha . Kuttanadu region

Outlay Rs.132.23 lakh
Major Components Side protection -3037m,Outer bund formation-8154m , Vachal protection-721m,Sluices and construction of Engine thara -8 nos and engine shed-8 nos., Flight of steps- 58 nos., Flood inlet – 1 no.
Status Completed

 

Infrastructural Development Project of Pazhangad Thekke and Vadakke Chal
Tranche RIDF XI
Aim of the Project

Protection of a water body and making a salt-water lake to fresh water lake of area 88 ha

Outlay Rs. 89.21 lakh
Major Components

Side protection – 2290m, Box culvert- 1 no. 

Status Completed

 

Salinity Control Project in the coastal tracts of Alappuzha and Kollam Districts
Tranche RIDF XII
Aim of the Project

Protect an area of 1235 ha covering over 8 panchayats in two districts from saline water intrusion and thereby improving cultivation of the area.

Outlay Rs. 196 lakh
Major Components

Outer Bund -1801m
Retaining wall-3103 m
Sluice-28 Nos.

Status Completed

 

Five Drainage & Flood Protection Project
Tranche RIDF XII
Aim of the Project

This project includes five major schemes on different districts.

Outlay Rs. 1728.59 lakh
Major Schemes

1. Angamali Manjali Canal (Outlay:583.63 lakhs) , EKM
2. Annammanda (Outlay : 512.82 lakh), Thrissur
3. Thodiyoor Vattakayal (Outlay : 252.52 lakh), Kollam
4. Nedumpana (Outlay : 157.95 lakh), Kollam
5. Palakkad Ponds (Outlay : 221.67 lakh)

Status Completed

 

Kuttanadu Development Project ( 9 Padasekharams)
Tranche RIDF XII
Aim of the Project

The project covers 9 padasekharams in all 3 regions of Kuttandu viz.,  Lower kuttanu, Upper Kuttandu and Kayal lands.  The project aimed to stabilize and sustain paddy cultivation in the area. 

Outlay Rs. 1211.13 lakh
Major Schemes

1. Bhagavathy padam : 81 ha
2. Kandamkari : 87 ha
3. Kavalam Kizhakkumpuram : 60 ha
4. Udampra : 39 ha
5. Erethra Engine thuruth : 147 ha
6. Kapponapuram : 237 ha
7. MN Block padom : 451.55 ha
8. Chennamkari Ayyankonari : 155 ha
9. Vengal padasekharam : 88 ha

Status Completed

 

Kuttanadu Development  Project-Indrankary Kachanikkari & Kochu Karudakary padam in Ramankary panchayath, Alappuzh
Tranche RIDF XIII
Aim of the Project

Controlling flood in the region (100 ha of paddy land)

Outlay Rs. 94.54 lakh
Major Components

Raising of outer bund – 3684 m
Side protedtion to outer bund – 1150m
Drainage channel -250 m
Engine thara – 1 no.

 

Status Completed

 

Purakkad Kari land development project - Infrastructural development works at Chalunkal padom
Tranche RIDF XIII
Aim of the Project

Controlling flood in the region (100 ha of paddy land)

Outlay Rs. 123.20 lakh
Major Components

Raising of outer bund – 3684 m
Side protedtion to outer bund – 1150m
Drainage channel -250 m
Engine thara – 1 no.

Status Completed

 

7  Drainage and Flood Protection Project
Tranche RIDF XIV
Aim of the Project

To convert the whole area in to two crops of paddy cultivation with some fish culture also.

Outlay Rs. 946.27 lakh
Major Schemes
  1. Manthara Meenchal Padasekharam
  2. Thettikkalam
  3. Anattupuram Choothanadi
  4. Kakkazham Padam
  5. Thazhavayal
  6. Ullitta Puncha
  7. Peruvelichal
Status Completed

 

Drainage and Flood Protection Project of Kuriyode Poonkode- Panayil Ela of Chadayamangalam in Kollam District
Tranche RIDF XV
Aim of the Project

Protect the paddy field from flood water and to avoid crop failure due to damage of side bund, improve drainage system of the canal, improve irrigation facilities of the padam, to bring the whole area in 2 crop of paddy cultivation and one crop of vegetable cultivation

Outlay Rs. 73.98 lakh
Major Components

Side Protection work – 1106m
Bund formation – 1120m, ramp- 4 nos.,
side drain 12m ,sluice cum bridge 1no., foot slab 1no., tractor bridge – 1 no

Status Completed

 

Drainage and flood protection project of Elampazhanoor Ela and Vadakke Vayal Ela in Kadakkal panchayath, Kollam district
Tranche RIDF XV
Aim of the Project

Protect the paddy field from flood water and to avoid crop failure due to damage of side bund, improve drainage system of the canal, improve irrigation facilities of the padam, to bring the whole area in 2 crop of paddy cultivation and one crop of vegetable cultivation

Outlay Rs. 77.27 lakh
Major Components

Side Protection work – 1706m , Bund – 1755,
Foot slab - 3nos.,Cross bar - 1no.

Status Completed

 

Infrastructural development  works of Arikupuram padasekharam in Vechoor panchayath in Kottayam District
Tranche RIDF XV
Aim of the Project

To increase the paddy production from one crop to two crop and increase the productivity from 3250kg/ha to 4000kg/ha

Outlay Rs. 50 lakh
Major Components

Retaining wall 1211.50 m and Outer bund 1705m.  

Status Completed

 

Infrastructural Development  for Intensive Crop Production of Poyya  Panchayat in Thrissur District.
Tranche RIDF XVI
Aim of the Project

To stabilize two crop paddy cultivation and to increase the production of coconut and inter crops.

Outlay Rs. 508.56 lakh
Major Components

Deepening of canal – 4600m, Bund formation – 9200m
VCB – 3 nos., Pipe sluice – 3 nos. Ramp - 5 nos,
Sluice – 5 nos, Regulator – 2 nos , Engine thara- 2 nos

Status Completed

 

Improvement Works of Cheriyavelinalloor Padasekharam in Velinalloor Panchayt in Kollam District
Tranche RIDF XVI
Aim of the Project

The aim of the project was to bring  the whole area (50ha)   into 2 crop of paddy cultivation  and one crop of vegetable cultivation.

Outlay Rs. 63 lakh
Major Components

Retaining wall -1144m, Bund formation – 472m
Foot slab – 11 nos., Culvert – 3 nos., Sluice- 1 no.
Ramp – 5 nos.

Status Completed

 

Drainage and Flood Protection Project of Padasekharams in Eroor Panchayt in Kollam District
Tranche RIDF XVI
Aim of the Project

To bring   the whole area into 2 crop of paddy cultivation and one crop of  vegetable cultivation and also improve the irrigation facilities of the padasekharams.

Outlay Rs. 67.71 lakh
Major Components

Side protection - 940m, Foot slab - 2nos,
Tractor slab - 3nos, Sluice - 1 no, Side drain - 120 m

Status Completed

 

Drainage and Flood Protection Project of Chanappara Kottaramvathukkal Ela in Ettiva Panchayat in Kollam District.
Tranche RIDF XVI
Aim of the Project

To bring the whole area into 2 crop of paddy cultivation and one crop of  vegetable cultivation.

Outlay Rs. 76.45 lakh
Major Components

Deepening of canal and formation of bund - 800m,
Retaining wall - 800m, Sluice cum tractor bridge - 1no,
Leading channel - 52.50m, Ramp - 8nos, Foot slab - 1

Status Completed

 

Infrastructural  Development Works at Kochuchangaram Padam in Kodamthuruth Panchayt in Alappuzha District.
Tranche RIDF XVI
Aim of the Project

To increase  production of paddy

Outlay Rs. 59.74 lakh
Major Components

Side protection to outer bund - 1216m,

Status Completed

 

Integrated Development Project for  augmentation of paddy  cultivation at Adiyam Midayikkunnu padasekharam in Thalayolaparambu in Kottayam District
Tranche RIDF XVI
Aim of the Project

To  increase  the paddy cultivation  from one crop to two  crops.

Outlay Rs. 68 lakh
Major Components

Concrete canal - 1384 m, Motorshed - 1 no

Status Completed

 

Infrastructural` Development Works at Pallithodu Padam in Kodamthuruth Panchayat Alappuzha
Tranche RIDF XVI
Aim of the Project

To improve the existing  fish culture  and vegetable cultivation and increase the production of paddy.

Outlay Rs. 68.05 lakh
Major Components

Raising of outer bund - 1865 m, Side protection to outer bund - 1500m, Engine thara - 1 no, Engine shed - 1no

Status Completed

 

Infrastructural Development Works at Changaram Padam in Kodamthuruth Panchayat in Alappuzha District
Tranche RIDF XVI
Aim of the Project

To bring the whole area into two crop cultivation

Outlay Rs. 46.02 lakh
Major Components

Resectioning of outer bund - 1200m, Side protection to outer bund - 1200m, Engine shed - 1no

Status Completed

 

Infrastructural Development  Works for intensive crop production in Chingoli panchayat in Alappuzha District
Tranche RIDF XVI
Aim of the Project

To bring the whole area into two crop cultivation

Outlay Rs. 440.02 lakh
Major Components

Deepening of thodu - 2480m, Side protection -4927m,
Side drain - 1800m, Culvert - 7 nos, Foot Slab - 8nos
Slab covering - 160m

Status Completed

 

Improvement works of Paramkode Panamthode ela in Pulikkuzhy ward in Elamad panchayat, Kollam District
Tranche RIDF XVI
Aim of the Project

To bring the whole area into two crop cultivation

Outlay Rs. 58.89 lakh
Major Components

Deepening of thodu - 2480m, Side protection -4927m,
Side drain - 1800m, Culvert - 7 nos, Foot Slab - 8nos
Slab covering - 160m

Status Completed

 

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 


 

 


 

 



 

 

 

 

 

 

 

 

 


 



 




 

 

 

 

 



 


 



 

 

       
 
 
    

 